Projects
4 PROJECTSFacility consolidation and staff onboarding
Learning a newly integrated studio building, closing out open issues, and moving staff in with walkthroughs and quick-reference guides.
Broadcast network core and site networks
Owning a Nexus spine/leaf core with Catalyst access, documenting it down to the port, and planning for growth.
Engineering NAS to SharePoint
Moving the whole engineering file share into SharePoint with its structure intact. The first attempt broke the timestamps, so I kept it as an archive, ran a clean migration, and worked every failed file.
Master control PC audit and migration
Replacing a Windows 10 master control engineering PC without losing the invisible setup it had collected over years. Audit it read-only, rebuild clean, move only what's understood, and keep a way back.
Notes
2 ARTICLESWhat to send a vendor
The seven things every escalation should include, so the first reply is an answer instead of a question.
How I write SOPs that people actually use
A master template, a lean template, and the sections that make a procedure trustworthy: author checks, validation, and rollback.