The job

A cathedral that also works as a broadcast site needed a real network: segmented, redundant on the WAN side, and built around the internet handoff that was already there.

The design

  • Firewall: Meraki MX250
  • Switching: Meraki MS355
  • Segmentation: multiple VLANs separating production, operations, and everything else
  • WAN resilience: dual active-active 5G cellular gateways across both WAN paths, alongside the existing internet handoff

How the design changed

The 2024 design-phase plan specified an MX85. The final build used an MX250. Designs should move when the requirements get clearer, and this one did.

The install

I did the install with help from the Chief Engineer and Tech Ops. The memorable part was a 300-foot cable run through a three-foot crawl space under the church.

The cutover

The whole cutover happened in one overnight maintenance window. The facility ran production the next day.

Later

SD-WAN now connects this site to the main broadcast center.

What I’d tell the next person

  • Let the design move. The plan said MX85 and the build used an MX250. That isn’t a failure of the plan. Requirements got clearer, so the design changed with them.
  • One window means everything is staged first. An overnight cutover only works if every piece is built, labeled, and checked before the window opens.
  • Physical work is part of network work. The crawl-space run was as important to this project as any config.

Still to add